ITB No.
|
Description/Location |
Approved Budget Cost |
Bidders |
Amount of Bid |
002-12 GQ |
Supply and Delivery of Construction Materials |
29,990.00 |
1018 Hardware |
29,926.00 |
Improvement
of Multi-purpose Building |
- |
- |
Brgy. San Roque |
- |
- |
003-12 GQ |
Supply and Delivery of Construction Materials |
10,000.00 |
1018 Hardware |
9,998.00 |
Concreting of Barangay Pathway |
- |
- |
Brgy. Danlagan Batis |
- |
- |
004-12 GQ |
Supply and Delivery of Medicines |
150,372.00 |
Nimpharma Drug |
141,969.00 |
Municipal Health Office |
LK Marketing |
145,002.00 |
|
Patville |
148,896.60 |
006-12 GQ |
Supply and Delivery of Heavy Equipment |
1,500,000.00 |
Alliance Auto |
1,498,000.00 |
Brand New 6-Wheeler Dump Truck |
- |
- |
Municipal Engineering Office |
- |
- |
008-12 GQ |
Supply and Delivery of Construction Materials |
68,628.00 |
1018 Hardware |
68,595.00 |
Concreting
of Barangay Talipapa Road |
- |
- |
Brgy. Aloneros |
- |
- |
009-12 GQ |
Supply and Delivery of Construction Materials |
14,125.00 |
New Yol Hardware |
14,100.00 |
Concreting of Bridge |
1018 Hardware |
14,125.00 |
Brgy. Himbubulo Este |
- |
- |
010-12 GQ |
Supply and Delivery of Construction Materials |
68,628.00 |
1018 Hardware |
68,595.00 |
Concreting
of Barangay Talipapa Road |
- |
- |
Brgy. Aloneros |
- |
- |
011-12 GQ |
Supply and Delivery of Construction Materials |
91,392.00 |
New Yol Hardware |
91,392.00 |
Construction of Multi-purpose Building |
- |
- |
Brgy. Danlagan Central |
- |
- |
012-12 GQ |
Supply and Delivery of Construction Materials |
79,698.00 |
1018 Hardware |
79,698.00 |
Concreting
of Barangay Road |
- |
- |
Brgy. Himbubulo Weste |
- |
- |
013-12 GQ |
Supply and Delivery of Construction Materials |
20,000.00 |
1018 Hardware |
20,000.00 |
Improvement of Day Care Center |
- |
- |
Brgy. Balinarin |
- |
- |
014-12 GQ |
Supply and Delivery of Construction Materials |
99,980.00 |
1018 Hardware |
99,850.00 |
Construction
of Covered Court |
- |
- |
Brgy. Guinayangan Elementary School |
- |
- |
015-12 GQ |
Supply and Delivery of Office Equipment |
6,200.00 |
Maine & Rome |
6,200.00 |
Steel Cabinet |
- |
- |
SB Sec. Office |
- |
- |
016-12 GQ |
Supply and Delivery of Comm. Equipment |
19,500.00 |
Maine & Rome |
19,500.00 |
Two-way
Radio |
- |
- |
Municipal Agriculture Office |
- |
- |
017-12 GQ |
Supply and Delivery of Construction Materials |
727,105.00 |
1018 Hardware |
726,660.00 |
Cons. Of Mun. Manpower Dev't Training Center |
- |
- |
Municipal Building |
- |
- |
018-12 GQ |
Supply and Delivery of Vegetable Seeds |
39,945.00 |
Allied Botanical Corp. |
39,920.00 |
Municipal Agriculture Office |
- |
- |
|
- |
- |
019-12 GQ |
Supply and Delivery of Construction Materials |
39,999.00 |
1018 Hardware |
39,792.00 |
Re-construction of Evacuation Center |
- |
- |
Brgy. San Roque |
- |
- |
020-12 GQ |
Supply and Delivery of Medicines |
150,044.00 |
Patville Pharma |
58,931.00 |
JR Medical Supplies |
60,465.60 |
Municipal Health Office |
Nimpharma Drug |
70,654.00 |
Kristel Pharma |
94,418.00 |
|
Dacema Trading |
136,791.68 |
LK Marketing |
149,714.00 |
021-12 GQ |
Supply and Delivery of Construction Materials |
10,000.00 |
1018 Hardware |
9,970.00 |
Construction of Footbridge |
- |
- |
Brgy. Arbismen |
- |
- |
022-12 GQ |
Supply and Delivery of Construction Materials |
149,900.00 |
1018 Hardware |
149,900.00 |
Improvement
of Water Supply System |
- |
- |
Various Barangays |
- |
- |
023-12 GQ |
Supply and Delivery of Construction Materials |
149,985.00 |
1018 Hardware |
149,985.00 |
Concreting of Pathway |
- |
- |
Various Barangays |
- |
- |
024-12 GQ |
Supply and Delivery of Construction Materials |
29,994.00 |
1018 Hardware |
29,994.00 |
Improvement
of Day Care Center |
- |
- |
Brgy. Magallanes |
- |
- |
025-12 GQ |
Supply and Delivery of Construction Materials |
11,000.00 |
1018 Hardware |
11,000.00 |
Improvement of Water Supply System |
- |
- |
Brgy. San Pedro II |
- |
- |
026-12 GQ |
Supply and Delivery of Construction Materials |
5,250.00 |
1018 Hardware |
5,250.00 |
Improvement
of School Covered Court |
- |
- |
Sta. Cruz Elementary School |
- |
- |
027-12 GQ |
Supply and Delivery of Construction Materials |
5,000.00 |
1018 Hardware |
5,000.00 |
Improvement of School Building |
- |
- |
Aloneros Elementary School |
- |
- |
028-12 GQ |
Supply and Delivery of Construction Materials |
5,000.00 |
1018 Hardware |
5,000.00 |
Improvement
of School Covered Court |
- |
- |
San Roque Pre- Elementary School |
- |
- |
029-12 GQ |
Supply and Delivery of Construction Materials |
5,000.00 |
1018 Hardware |
5,000.00 |
Improvement of School Building |
- |
- |
Dungawan Paalyunan Elementary School |
- |
- |
030-12 GQ |
Supply and Delivery of Construction Materials |
5,015.00 |
1018 Hardware |
5,010.00 |
Repair of
School Office |
- |
- |
Danlagan Reserva Elementary School |
- |
- |
031-12 GQ |
Supply and Delivery of Construction Materials |
5,040.00 |
1018 Hardware |
5,040.00 |
Repair of Ceiling of 1 Classroom Building |
- |
- |
Gapas Elementary School |
- |
- |
032-12 GQ |
Supply and Delivery of Construction Materials |
19,992.00 |
1018 Hardware |
19,992.00 |
Improvement
of Evacuation Center |
- |
- |
Brgy. Salacan |
- |
- |
033-12 GQ |
Supply and Delivery of Construction Materials |
4,910.00 |
1018 Hardware |
4,900.00 |
Improvement of School Building |
- |
- |
Dancalan Central Elementary School |
- |
- |
034-12 GQ |
Supply and Delivery of Construction Materials |
20,020.00 |
1018 Hardware |
20,000.00 |
Improvement
of Water Supply System |
- |
- |
Brgy. Dungawan Central |
- |
- |
035-12 GQ |
Supply and Delivery of Construction Materials |
53,980.00 |
1018 Hardware |
53,980.00 |
Concreting of Pathway |
- |
- |
Brgy. Danlagan Reserva (Eco-Tourism) |
- |
- |
036-12 GQ |
Supply and Delivery of Construction Materials |
49,998.00 |
1018 Hardware |
49,978.00 |
Improvement
of Evacuation Center |
- |
- |
Brgy. Dungawan Paalyunan |
- |
- |
037-12 GQ |
Supply and Delivery of Construction Materials |
4,995.00 |
1018 Hardware |
4,990.00 |
Improvement of School Building |
- |
- |
Dancalan Caimawan Elementary School |
- |
- |
038-12 GQ |
Supply and Delivery of Construction Materials |
13,960.00 |
1018 Hardware |
13,960.00 |
Improvement
of Multi-purpose Building |
- |
- |
Brgy. Danlagan Resrva |
- |
- |
039-12 GQ |
Supply and Delivery of Construction Materials |
248,270.00 |
1018 Hardware |
248,270.00 |
Improvement & Beautification of Mun. Tree |
- |
- |
Park in ABC Building/Brgy. Calimpak |
- |
- |
040-12 GQ |
Supply and Delivery of Construction Materials |
19,993.00 |
1018 Hardware |
19,993.00 |
Improvement
of Evacuation Center |
- |
- |
Brgy. Magallanes |
- |
- |
041-12 GQ |
Supply and Delivery of Construction Materials |
14,220.00 |
1018 Hardware |
14,190.00 |
Repair & Improvement of Line Canal |
- |
- |
Brgy. Poblacion |
- |
- |
043-12 GQ |
Supply and Delivery of Construction Materials |
3,820.00 |
1018 Hardware |
3,820.00 |
Improvement
of School Building |
- |
- |
Sintones Elementary School |
- |
- |
044-12 GQ |
Supply and Delivery of Construction Materials |
5,000.00 |
1018 Hardware |
5,000.00 |
Improvement of School Building |
- |
- |
Ligpit Bantayan Elementary School |
- |
- |
045-12 GQ |
Supply and Delivery of Construction Materials |
106,070.00 |
1018 Hardware |
105,995.00 |
Repair/Improvement of Municipal Building |
- |
- |
|
- |
- |
046-12 GQ |
Supply and Delivery of Construction Materials |
19,990.00 |
1018 Hardware |
19,940.00 |
Improvement of Multi-purpose Building |
- |
- |
Brgy. Sisi |
- |
- |
047-12 GQ |
Supply and Delivery of Construction Materials |
5,100.00 |
1018 Hardware |
5,100.00 |
Improvement
of School Building |
- |
- |
Arbismen Elementary School |
- |
- |
048-12 GQ |
Supply and Delivery of Heavy Equipment Tire |
92,000.00 |
Maine & Rome |
92,000.00 |
Municipal Engineering Office |
- |
- |
|
- |
- |
042B-12 GQ |
Supply and Delivery of Medical Supplies |
49,835.00 |
Dacema Trading |
48,990.98 |
Municipal
Health Office |
- |
- |
|
- |
- |
049-12 GQ |
Supply and Delivery of Construction Materials |
19,965.00 |
New Yol Hardware |
19,965.00 |
Improvement of Multi-purpose Hall |
- |
- |
Brgy. Danlagan Central |
- |
- |
050-12 GQ |
Supply and Delivery of Construction Materials |
19,550.00 |
New Yol Hardware |
19,550.00 |
Spring
Development Project |
- |
- |
Brgy. Capuluan Central |
- |
- |
051-12 GQ |
Supply and Delivery of Construction Materials |
20,000.00 |
New Yol Hardware |
20,000.00 |
Improvement of Multi-purpose Building |
- |
- |
Brgy. A. Mabini |
- |
- |
052-12 GQ |
Supply and Delivery of Construction Materials |
5,000.00 |
1018 Hardware |
5,000.00 |
Repair of
Ceiling |
- |
- |
Gapas Elementary School |
- |
- |
053-12 GQ |
Supply and Delivery of Construction Materials |
351,780.00 |
1018 Hardware |
351,780.00 |
Concreting of ARCDP Road |
- |
- |
|
- |
- |
054-12 GQ |
Supply and Delivery of Construction Materials |
5,000.00 |
1018 Hardware |
5,000.00 |
Repair of
Office |
- |
- |
Danlagan Reserva Elementary School |
- |
- |
055-12 GQ |
Supply and Delivery of Construction Materials |
20,000.00 |
1018 Hardware |
20,000.00 |
Improvement of Evacuation Center |
- |
- |
Brgy. Salacan |
- |
- |
056-12 GQ |
Supply and Delivery of Construction Materials |
19,750.00 |
1018 Hardware |
19,750.00 |
Concreting
of Pathway |
- |
- |
Brgy. Himbubulo Este |
- |
- |
057-12 GQ |
Supply and Delivery of Construction Materials |
9,900.00 |
1018 Hardware |
9,900.00 |
Improvement of Water Supply System |
- |
- |
Brgy. Sintones |
- |
- |
058-12 GQ |
Supply and Delivery of Construction Materials |
21,123.00 |
1018 Hardware |
21,108.00 |
Construction
of Comfort Room of Day Care |
- |
- |
Brgy. Capuluan Tulon |
- |
- |
059-12 GQ |
Supply and Delivery of Construction Materials |
14,790.00 |
New Yol Hardware |
14,790.00 |
Improvement of Multi-purpose Building |
- |
- |
Brgy. Lubigan |
- |
- |
060-12 GQ |
Supply and Delivery of Construction Materials |
14,960.00 |
New Yol Hardware |
14,960.00 |
Improvement
of Multi-purpose Building |
- |
- |
Brgy. Dancalan Central |
- |
- |
061-12 GQ |
Supply and Delivery of Construction Materials |
15,284.00 |
New Yol Hardware |
15,284.00 |
Improvement of Multi-purpose Building |
- |
- |
Brgy. Manggalang |
- |
- |
062-12 GQ |
San Isidro-Ligpit Bantayan Small Scale Irrigation |
2,998,185.58 |
Bomel Construction |
2,915,267.51 |
Brgy. Ligpit
Bantayan & Brgy. San Isidro |
- |
- |
|
- |
- |
064-12 GQ |
Supply and Delivery of Books & Reading Mat. |
5,000,000.00 |
Golden Books International |
4,965,700.00 |
Basic Literacy Program/ALS |
- |
- |
|
- |
- |
063B-12 GQ |
Sta. Cruz Small Scale Irrigation |
1,498,092.84 |
Bomel Construction |
1,476,568.52 |
Brgy. Sta. Cruz |
- |
- |
|
- |
- |
065-12 GQ |
Supply and Delivery of Construction Materials |
29,985.00 |
1018 Hardware |
29,780.00 |
Improvement of Evacuation Center |
- |
- |
Brgy. Tikay |
- |
- |
066-12 GQ |
Supply and Delivery of Construction Materials |
20,000.00 |
1018 Hardware |
19,952.00 |
Improvement
of Multi-purpose Building |
- |
- |
Brgy. Sta. Teresita |
- |
- |
067-12 GQ |
Supply and Delivery of Construction Materials |
5,000.00 |
1018 Hardware |
5,000.00 |
Improvement of School Building |
- |
- |
Lubigan Elementary School |
- |
- |
068-12 GQ |
Supply and Delivery of Construction Materials |
26,960.00 |
New Yol Hardware |
26,960.00 |
Repair of
Day Care Center |
- |
- |
Brgy. Lubigan |
- |
- |
069-12 GQ |
Supply and Delivery of Construction Materials |
19,984.06 |
1018 Hardware |
19,891.00 |
Improvement of Multi-purpose Building |
- |
- |
Brgy. Sta. Cruz |
- |
- |
070-12 GQ |
Supply and Delivery of Construction Materials |
11,000.00 |
1018 Hardware |
10,975.00 |
Painting &
Imp. of Multi-purpose Building |
- |
- |
Sta. Cruz National High School |
- |
- |
071-12 GQ |
Supply and Delivery of Construction Materials |
20,000.00 |
1018 Hardware |
20,000.00 |
Installation of Street Light |
- |
- |
Brgy. San Isidro |
- |
- |
072-12 GQ |
Supply and Delivery of Construction Materials |
19,990.00 |
1018 Hardware |
19,955.00 |
Improvement
of Multi-purpose Hall |
- |
- |
Brgy. Ermita |
- |
- |
073-12 GQ |
Supply and Delivery of Construction Materials |
19,997.50 |
1018 Hardware |
19,997.50 |
Improvement of Brgy. Health Center |
- |
- |
Brgy. Sta. Maria |
- |
- |
074-12 GQ |
Supply and Delivery of Medicines |
165,594.00 |
JR Medical Supplies |
89,466.40 |
Municipal
Health Office |
Patville Pharma |
97,344.00 |
|
Nimpharma Drug |
102,450.00 |
Lk Marketing |
155,593.80 |
075-12 GQ |
Supply and Delivery of Office Equipment |
25,000.00 |
Maine & Rome G Mdse |
25,000.00 |
Projector |
- |
- |
Mayor's Office |
- |
- |
077-12 GQ |
Supply and Delivery of Construction Materials |
39,195.00 |
New Yol Hardware |
39,195.00 |
Municipal
Evacuation Center |
- |
- |
Municipal Building |
- |
- |
078-12 GQ |
Supply and Delivery of Construction Materials |
38,915.00 |
New Yol Hardware |
38,915.00 |
Municipal Drainage |
- |
- |
|
- |
- |
079-12 GQ |
Supply and Delivery of Construction Materials |
29,500.00 |
New Yol Hardware |
29,550.00 |
Repair of
Water Supply System |
- |
- |
Various Barangays (District III) |
- |
- |
080-12 GQ |
Supply and Delivery of Construction Materials |
20,001.00 |
New Yol Hardware |
19,999.95 |
Improvement of Spring Development Project |
- |
- |
Brgy. Hinabaan |
- |
- |
081-12 GQ |
Supply and Delivery of Construction Materials |
29,969.00 |
1018 Hardware |
29,969.00 |
Repair of
Pathway |
- |
- |
Various Barangays (District III) |
- |
- |
082-12 GQ |
Supply and Delivery of Construction Materials |
19,970.00 |
1018 Hardware |
19,970.00 |
Concreting of Pathway |
- |
- |
Brgy. San Miguel |
- |
- |
083-12 GQ |
Supply and Delivery of Construction Materials |
20,001.00 |
1018 Hardware |
19,995.00 |
Improvement
of Multi-purpose Building |
- |
- |
Brgy. Triumpo |
- |
- |
084-12 GQ |
Supply and Delivery of Construction Materials |
149,792.50 |
1018 Hardware |
149,785.00 |
Ceiling Installation of Municipal Development |
- |
- |
Training Center Building |
- |
- |
085-12 GQ |
Supply and Delivery of Construction Materials |
14,800.50 |
1018 Hardware |
14,800.50 |
Improvement
of Multi-purpose Building |
- |
- |
Brgy. Magsaysay |
- |
- |
086-12 GQ |
Supply and Delivery of Construction Materials |
25,932.00 |
New Yol Hardware |
25,932.00 |
Construction of Comfort Room |
- |
- |
Brgy. Danlagan Central |
- |
- |
087-12 GQ |
Supply and Delivery of Construction Materials |
20,000.00 |
1018 Hardware |
20,000.00 |
Improvement
of Multi-purpose Building |
- |
- |
Brgy. Cabibihan |
- |
- |
088-12 GQ |
Supply and Delivery of Construction Materials |
19,980.00 |
1018 Hardware |
19,980.00 |
Improvement of Multi-purpose Hall |
- |
- |
Brgy. Ligpit Bantayan |
- |
- |
089-12 GQ |
Supply and Delivery of Construction Materials |
20,000.00 |
1018 Hardware |
20,000.00 |
Improvement
of Multi-purpose Building |
- |
- |
Brgy. Bukal Maligaya |
- |
- |
090-12 GQ |
Supply and Delivery of Polo Shirt & Pants |
49,950.00 |
Brainen Gen. Mdse. |
49,950.00 |
PPLB Office |
- |
- |
|
- |
- |
091-12 GQ |
Supply and Delivery of Construction Materials |
4,995.00 |
1018 Hardware |
4,995.00 |
Improvement
of School Building |
- |
- |
Guinayangan Elementary School |
- |
- |
092-12 GQ |
Supply and Delivery of Construction Materials |
4,995.00 |
1018 Hardware |
4,995.00 |
Improvement of School Building |
- |
- |
Gregorio Mendoza Elementary School |
- |
- |
093-12 GQ |
Supply and Delivery of Comm. Equipment |
72,000.00 |
Maine & Rome |
72,000.00 |
SB Office |
- |
- |
|
- |
- |
094-12 GQ |
Supply and Delivery of Dental Supplies |
24,990.00 |
1018 School Supplies |
24,990.00 |
Municipal Health Office |
- |
- |
|
- |
- |
095-12 GQ |
Supply and Delivery of Construction Materials |
5,000.00 |
1018 Hardware |
5,000.00 |
Painting of
Roofing |
- |
- |
Dungawan Central Elementary School |
- |
- |
096-12 GQ |
Supply and Delivery of Construction Materials |
13,100.00 |
1018 Hardware |
13,100.00 |
Replacement of Ceiling & Joist |
- |
- |
New Public Market |
- |
- |
097-12 GQ |
Supply and Delivery of Construction Materials |
33,987.00 |
1018 Hardware |
33,977.00 |
Construction
of Cottage |
- |
- |
Balinarin Resort |
- |
- |
098-12 GQ |
Supply and Delivery of Construction Materials |
24,995.00 |
1018 Hardware |
24,995.00 |
Improvement of School Building |
- |
- |
Guinayangan Elementary School |
- |
- |
099-12 GQ |
Supply and Delivery of Construction Materials |
30,001.00 |
1018 Hardware |
30,000.00 |
Improvement
of Day Care Center |
- |
- |
Bagong Silang |
- |
- |
100-12 GQ |
Supply and Delivery of Office Equipment |
18,800.00 |
Maine & Rome G Mdse |
18,800.00 |
Table & Chair |
- |
- |
Office of the Municipal Treasury |
- |
- |
101-12 GQ |
Supply and Delivery of Construction Materials |
89,920.00 |
New Yol Hardware |
89,920.00 |
Repair/Maintenance of Pathway |
- |
- |
Brgy. Aloneros |
- |
- |
102-12 GQ |
Supply and Delivery of Fishing Materials |
58,212.00 |
New Yol Hardware |
58,210.95 |
Municipal Agriculture Office |
- |
|
|
- |
|
103-12 GQ |
Supply and Delivery of Office Equipment |
18,050.00 |
Maine & Rome G Mdse |
18,050.00 |
SB Office |
- |
- |
|
- |
- |
104-12 GQ |
Supply and Delivery of Construction Materials |
19,994.00 |
1018 Hardware |
19,994.00 |
Construction of Canal |
- |
|
Brgy. Calimpak |
- |
|
105-12 GQ |
Supply and Delivery of Construction Materials |
29,455.00 |
1018 Hardware |
29,455.00 |
Improvement
of Multi-purpose Building |
- |
- |
Brgy. Danlagan Cabayao |
- |
- |
106-12 GQ |
Supply and Delivery of Construction Materials |
19,458.00 |
1018 Hardware |
19,458.00 |
Improvement of Multi-purpose Building |
- |
|
Brgy. Bagong Silang |
- |
|
107-12 GQ |
Supply and Delivery of Construction Materials |
24,985.00 |
1018 Hardware |
24,962.50 |
Improvement
of Day Care Center |
- |
- |
Brgy. A. Mabini |
- |
- |
108-12 GQ |
Supply and Delivery of Construction Materials |
174,770.00 |
1018 Hardware |
174,770.00 |
Improvement of Water Supply System |
- |
|
Various Barangays |
- |
|
109-12 GQ |
Supply and Delivery of Construction Materials |
174,990.00 |
1018 Hardware |
174,990.00 |
Concreting
of Pathway |
- |
- |
Various Barangays |
- |
- |
110-12 GQ |
Supply and Delivery of Construction Materials |
13,005.00 |
1018 Hardware |
12,975.00 |
Improvement of School Building |
- |
|
Aloneros National High School |
- |
|
111-12 GQ |
Supply and Delivery of
Medicines |
159,697.00 |
Lk Marketing |
60,589.34 |
Municipal Health Office |
Patville Pharma |
64,690.00 |
|
Nimpharma Drug |
69,962.60 |
112-12 GQ |
Supply and Delivery of Construction Materials |
5,022.50 |
1018 Hardware |
5,017.50 |
Improvement of School Building |
- |
|
San Isidro Elementary School |
- |
|
113-12 GQ |
Supply and Delivery of Construction Materials |
5,115.00 |
1018 Hardware |
5,115.00 |
Improvement
of School Building |
- |
- |
Nabangka Elementary School |
- |
- |
114-12 GQ |
Supply and Delivery of Construction Materials |
5,000.00 |
1018 Hardware |
5,000.00 |
Improvement of School Building |
- |
- |
Sisi Elementary School |
- |
- |
115-12 GQ |
Supply and Delivery of
Construction Materials |
20,000.00 |
1018 Hardware |
20,000.00 |
Improvement of
Multi-purpose Building in |
- |
- |
Brgy. Himbubulo Weste |
- |
- |
116-12 GQ |
Supply and Delivery of Construction Materials |
5,040.00 |
1018 Hardware |
5,020.00 |
Improvement of School Building in |
- |
- |
San Luis II Elementary School |
- |
- |
117-12 GQ |
Supply and Delivery of Construction Materials |
46,085.00 |
New Yol Hardware |
46,085.00 |
Concreting
of Barangay Road in |
- |
- |
Brgy. San Jose |
- |
- |
118-12 GQ |
Supply and Delivery of Construction Materials |
15,500.00 |
New Yol Hardware |
15,500.00 |
Riprapping of River Bank |
- |
- |
Brgy. Calimpak |
- |
- |
119-12 GQ |
Supply and Delivery of Construction Materials |
7,700.00 |
New Yol Hardware |
7,700.00 |
Concreting
of Barangay Road |
- |
- |
Brgy. San Jose |
- |
- |
120-12 GQ |
Supply and Delivery of Construction Materials |
14,845.00 |
New Yol Hardware |
14,845.00 |
Construction of Line Canal |
- |
- |
Brgy. Manggagawa |
- |
- |
121-12 GQ |
Supply and Delivery of Construction Materials |
5,000.00 |
1018 Hardware |
5,000.00 |
Painting of
School Building |
- |
- |
Bagong Silang Elementary School |
- |
- |
122-12 GQ |
Supply and Delivery of Construction Materials |
13,250.00 |
1018 Hardware |
13,250.00 |
Cementing Entrance |
- |
- |
Municipal Development Center |
- |
- |
123-12 GQ |
Supply and Delivery of Sports Uniform |
83,705.00 |
Brainen Gen. Mdse. |
71,775.00 |
Guinayangan
District Office |
Achabuncho Gen. Mdse. |
78,955.00 |
|
- |
- |
124-12 GQ |
Supply and Delivery of Medicines |
166,130.00 |
Lk Marketing |
50,235.54 |
Municipal Health Office |
Nimpharma Drug |
66,304.80 |
|
- |
- |
125-12 GQ |
Supply and Delivery of
Construction Materials |
19,950.00 |
1018 Hardware |
19,950.00 |
Construction
of Footbridge |
- |
- |
Brgy. San Pedro I |
- |
- |
126-12 GQ |
Supply and Delivery of Construction Materials |
19,995.00 |
1018 Hardware |
19,370.00 |
Rehabilitation of Multi-purpose Building |
- |
- |
Brgy. Mqanlayo |
- |
- |
127-12 GQ |
Supply and Delivery of Construction Materials |
20,002.50 |
1018 Hardware |
19,955.00 |
Concreting
of Pathway |
- |
- |
Brgy. Aloneros |
- |
- |
129-12 GQ |
Supply and Delivery of Construction Materials |
179,990.00 |
1018 Hardware |
179,735.00 |
Concreting of Pathway |
- |
- |
Various Barangays |
- |
- |
130-12 GQ |
Supply and Delivery of Construction Materials |
179,780.00 |
1018 Hardware |
179,780.00 |
Improvement
of Water Supply System |
- |
- |
Various Barangays |
- |
- |
131-12 GQ |
Supply and Delivery of Construction Materials |
22,245.00 |
1018 Hardware |
22,245.00 |
Repair of Water Line |
- |
- |
Municipal Health Office |
- |
- |
132-12 GQ |
Supply and Delivery of Construction Materials |
24,998.98 |
1018 Hardware |
24,997.00 |
Repair of
Municipal Building |
- |
- |
|
- |
- |
134-12 GQ |
Supply and Delivery of Sports Uniform |
6,125.00 |
Brainen Gen. Mdse. |
5,905.00 |
Guinayangqan Elementary School |
- |
- |
|
- |
- |
137-12 GQ |
Supply and Delivery of Office Equipment |
106,800.00 |
Maine & Rome G Mdse |
106,800.00 |
Mayor's Office |
- |
- |
|
- |
- |
138-12 GQ |
Supply and Delivery of Office Equipment |
8,800.00 |
Maine & Rome G Mdse |
8,800.00 |
MSWD Office |
- |
- |
|
- |
- |
139-12 GQ |
Supply and Delivery of Office Equipment |
21,100.00 |
Maine & Rome G Mdse |
21,100.00 |
MCR Office |
- |
- |
|
- |
- |
140-12 GQ |
Supply and Delivery of Office Equipment |
106,500.00 |
Maine & Rome G Mdse |
106,500.00 |
SB Office |
- |
- |
|
- |
- |
141-12 GQ |
Supply and Delivery of
Office Equipment |
45,500.00 |
Maine & Rome G Mdse |
45,500.00 |
MDRRM Office |
- |
- |
|
- |
- |
142-12 GQ |
Supply and Delivery of Medical Supplies |
55,665.00 |
Nimpharma Drug |
55,160.00 |
Municipal Health Office |
- |
- |
|
- |
- |
143-12 GQ |
Supply and Delivery of Water Pump |
13,000.00 |
1018 Hardware |
13,000.00 |
Improvement
of water Supply System |
- |
- |
Brgy. Gapas |
- |
- |
144-12 GQ |
Supply and Delivery of Construction Materials |
20,527.00 |
1018 Hardware |
20,527.00 |
Repair of Municipal Building |
- |
- |
|
- |
- |
145-12 GQ |
Supply and Delivery of Construction Materials |
37,085.00 |
1018 Hardware |
37,070.00 |
Improvement of RCPC and Riprapping |
- |
- |
Brgy. Capuluan Central |
- |
- |
146-12 GQ |
Supply and Delivery of Construction Materials |
11,995.00 |
1018 Hardware |
11,992.00 |
Improvement of Comfort Room |
- |
- |
Nabangka National High School |
- |
- |
147-12 GQ |
Supply and Delivery of Medicines |
151,340.00 |
Nimpharma Drug |
54,384.40 |
Municipal Health Office |
LK Marketing |
59,000.00 |
|
JR Medical Supplies |
59,074.50 |
148-12 GQ |
Supply and Delivery of Construction Materials |
5,000.00 |
1018 Hardware |
5,000.00 |
Repair of Stage |
- |
- |
Capuluan Tulon Elementary School |
- |
- |
149-12 GQ |
Supply and Delivery of Construction Materials |
19,860.00 |
1018 Hardware |
19,860.00 |
Construction of Water Tank |
- |
- |
Brgy. Sta. Teresita |
- |
- |
150-12 GQ |
Supply and Delivery of Construction Materials |
174,900.00 |
1018 Hardware |
174,900.00 |
Improvement of Water Supply System |
- |
- |
Various Barangays |
- |
- |
151-12 GQ |
Supply and Delivery of Construction Materials |
30,000.00 |
1018 Hardware |
30,000.00 |
Construction of Multi-purpose Hall |
- |
- |
Barangay A. Mabini |
- |
- |
152-12 GQ |
Supply and Delivery of Construction Materials |
9,880.00 |
1018 Hardware |
9,880.00 |
Repair/Maintenance of Pathway |
- |
- |
District IX Barangays |
- |
- |
153-12 GQ |
Supply and Delivery of Construction Materials |
9,880.00 |
1018 Hardware |
9,880.00 |
Repair/Maintenance of Pathway |
- |
- |
District VI Barangays |
- |
- |
154-12 GQ |
Supply and Delivery of Construction Materials |
10,000.00 |
1018 Hardware |
10,000.00 |
Repair/Maintenance of Water Supply System |
- |
- |
District I Barangays |
- |
- |
155-12 GQ |
Supply and Delivery of Construction Materials |
9,836.50 |
1018 Hardware |
9,836.50 |
Improvement of School Building |
- |
- |
Guinayangan National High School |
- |
- |
156-12 GQ |
Supply and Delivery of Office Equipment |
15,800.00 |
Maine & Rome Gen Mdse |
15,800.00 |
Steel Cabinet |
- |
- |
Office of the Municipal Treasurer |
- |
- |
157-12 GQ |
Supply and Delivery of Construction Materials |
19.977.00 |
New Yol Hardware |
19,977.00 |
Improvement of Multi-purpose Building |
- |
- |
Barangay Lubigan |
- |
- |
158-12 GQ |
Supply and Delivery of Construction Materials |
20,000.00 |
New Yol Hardware |
20,000.00 |
Improvement of Water Supply system |
- |
- |
Barangay San Luis I |
- |
- |
159-12 GQ |
Supply and Delivery of Construction Materials |
19.946.00 |
New Yol Hardware |
19,946.00 |
Improvement of Multi-purpose Center |
- |
- |
Barangay Manggalang |
- |
- |
160-12 GQ |
Supply and Delivery of Construction Materials |
19,980.00 |
New Yol Hardware |
19,980.00 |
Improvement of Multi-purpose Center |
- |
- |
Barangay San Pedro II |
- |
- |
161-12 GQ |
Supply and Delivery of Construction Materials |
20.000.00 |
New Yol Hardware |
20,000.00 |
Concreting of Pathway |
- |
- |
Barangay Danlagan Reserva |
- |
- |
162-12 GQ |
Supply and Delivery of Construction Materials |
49,800.00 |
1018 Hardware |
49,800.00 |
Repair/Maintenance of Pathway |
- |
- |
District VII Barangays |
- |
- |
163-12 GQ |
Supply and Delivery of Construction Materials |
49,900.00 |
1018 Hardware |
49,900.00 |
Repair/Maintenance of Water Supply System |
- |
- |
District VII Barangays |
- |
- |
164-12 GQ |
Supply and Delivery of Construction Materials |
69,950.00 |
1018 Hardware |
69,950.00 |
Repair/Maintenance of Water Supply System |
- |
- |
District IV Barangays |
- |
- |
165-12 GQ |
Supply and Delivery of Construction Materials |
10,000.00 |
1018 Hardware |
10,000.00 |
Construction of Pathway |
- |
- |
Brgy. Dancalan Caimawan |
- |
- |
166-12 GQ |
Supply and Delivery of Construction Materials |
20,425.00 |
1018 Hardware |
20,420.00 |
Installation of Street Lights |
- |
- |
Brgy. Capuluan Central |
- |
- |
167-12 Gq |
Supply and Delivery of Office Equipment |
18,600.00 |
Maine & Rome G Mdse |
18,600.00 |
Steel Cabinet and Chair |
- |
- |
Human Resource and Management Office |
- |
- |
168-12 GQ |
Supply and Delivery of Construction Materials |
69,600.00 |
1018 Hardware |
69,600.00 |
Repair/Maintenance of Water Supply System |
- |
- |
District VIII Barangays |
- |
- |
169-12 GQ |
Supply and Delivery of Office Equipment |
100,000.00 |
Maine & Rome G Mdse |
98,600.00 |
Camera, Projector and Sound System |
- |
- |
MPDC Office |
- |
- |
170-12 GQ |
Supply and Delivery of Medicines |
163,118.00 |
LK Marketing |
75,263.88 |
Municipal Health Office |
- |
- |
|
- |
- |
171-12 GQ |
Supply and Delivery of Construction Materials |
39,850.00 |
1018 Hardware |
39,850.00 |
Repair/Improvement of Water Supply System |
- |
- |
District IX Barangays |
- |
- |
172-12 GQ |
Supply and Delivery of Construction Materials |
39,950.00 |
1018 Hardware |
39,950.00 |
Repair/Improvement of Water Supply System |
- |
- |
District V Barangays |
- |
- |
173-12 GQ |
Construction of Cadig Water Supply System |
7,000,000.00 |
Bomel Construction |
6,985,729.13 |
SALINTUBIG Project |
- |
- |
Cadig Area |
- |
- |
174-12 GQ |
Supply and Delivery of Construction Materials |
34,800.00 |
1018 Hardware |
34,800.00 |
Improvement of Water supply system |
- |
- |
Barangay Manggagawa |
- |
- |
175-12 GQ |
Supply and Delivery of Construction Materials |
38,500.00 |
1018 Hardware |
38,500.00 |
Improvement of Water Supply System |
- |
- |
Barangay San Lorenzo |
- |
- |
176-12 GQ |
Supply and Delivery of Construction Materials |
12,835.00 |
1018 Hardware |
12,820.00 |
Improvement of Water Supply System |
- |
- |
Barangay Ermita |
- |
- |
177-12 GQ |
Supply and Delivery of Construction Materials |
11,644.00 |
1018 Hardware |
11,644.00 |
Improvement of Stage |
- |
- |
Barangay Capuluan Tulon |
- |
- |
178-12 GQ |
Supply and Delivery of Construction Materials |
49,094.00 |
1018 Hardware |
44,094.00 |
Repair of School Building |
- |
- |
Guinayangan Elementary School |
- |
- |
179-12 GQ |
Supply and Delivery of Construction Materials |
146,938.00 |
1018 Hardware |
146,558.00 |
Improvement of Laboratory Room |
- |
- |
Municipal health Building |
- |
- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|